Metal Building Foundation Options for Colorado: Slab, Piers or Helical Piles

Red steel rigid frame of a new metal building being erected, with a crane lifting a beam and workers in lift baskets at the column tops
Erecting the steel frame of a new factory unit. Frames like these are light for their size and push sideways on their foundations, so the foundation has to hold them down and hold them in. Photo: Nigel Mykura, via Geograph and Wikimedia Commons · Source · CC BY-SA 2.0 · Resized

A metal building foundation has to do two jobs a house foundation rarely does: hold a very light building down against wind uplift, and stop its steel frames from pushing the column bases outward. The common answers are heavy spread footings, footings tied together under the slab, a mat, or deep foundations such as drilled piers and helical piles. In Denver every one of them also has to reach below the 36-inch frost line unless the building is small enough for the code’s exception.

The kit you order doesn’t include any of this. The supplier sends the steel and a list of column reactions. Someone still has to turn those numbers into a foundation design that a building department will approve.

Why steel building foundations are different

Alexander Newman, writing in STRUCTURE magazine, puts the total weight of a single-story metal building system at 2 to 5 pounds per square foot. That’s light enough that a strong wind creates net uplift on the foundations. The building code makes it harder still: the basic allowable stress load combination lets the designer count no more than 60 percent of the dead load against wind uplift. So the foundation has to supply the weight the building lacks.

The second problem is sideways thrust. Gable rigid frames, the most common frame type in these buildings, push horizontally on their column bases. Under gravity load the two sides push outward in opposite directions. Under wind or seismic load the reactions usually act in the same direction. A house rarely has that kind of horizontal load at every column, let alone combined with uplift.

Newman also points to a buying-order problem. When the owner buys the steel first and treats the foundation as an afterthought, the manufacturer may pick the cheapest frame for itself. His example is fixed-base columns, which save the manufacturer a little and can add a lot to the foundation cost compared with pinned bases.

How uplift sizes a footing

The worked example in Newman’s article shows the effect. It takes an interior column of a multi-span rigid frame with columns 60 feet apart and frames 25 feet on center, so each column carries 1,500 square feet of roof. The roof loads are 3 psf dead, 30 psf snow and 14 psf wind uplift, on soil with a 4,000 psf allowable bearing pressure.

For downward load alone, the footing works out to about 3.7 by 3.7 feet. Checked for uplift, it needs enough concrete and soil on top to act as ballast, and the final footing grows to 8 by 8 feet and 3 feet 8 inches deep. Newman notes that ballast often sets the minimum size of column foundations for these buildings, which surprises designers who haven’t done one before.

Metal building foundation options compared

The table follows the systems described in STRUCTURE, with helical piles added as a deep foundation option.

SystemHow it handles uplift and thrustStrengthsWeak points
Hairpins with slab tiesSteel hairpins at each column tie the thrust into the floor slab reinforcementCheapest way to resist the horizontal reactionsDepends on the slab. Cut the slab or hit a construction joint and the load path is gone. Slabs on ground fall outside ACI 318 unless they transmit lateral forces, so the slab must be designed and built with more care
Tie rods or grade beamsOpposite column footings tied together across the buildingGrade beams below the slab survive later slab workCan’t be used where trenches, pits or depressions cross the floor
Moment-resisting footingsWide, heavy footing resists overturning and sliding on its ownDoesn’t rely on the slab; works with pits, no floor, or a sloping siteLonger design and higher concrete cost
Slab with haunch (downturned slab)Thickened slab edge acts as the footingFamiliar from house slabsDesigned properly, the haunch ends up about as big as a moment-resisting footing
Trench footingDeep trench filled with concrete for weight and passive soil pressureDoesn’t rely on the slabNeeds soil that will stand open while the trench is dug
MatThick slab reinforced top and bottom across the footprintHeavy, and the reinforcement ties the frames togetherExpensive; doesn’t work with deep pits; anchor bolt placement for interior columns can be awkward
Drilled piers (caissons)Concrete weight plus grade beams for passive resistanceDoesn’t rely on the slabDrill rig, concrete and cure time; the shaft passes through any expansive clay
Helical pilesSteel shafts with helix plates screwed in to a design torque; designed for compression, tension and lateral loadUplift comes from the helix plates bearing on deeper soil, not from concrete weight; no cure time before the frame goes upNeeds an engineer’s design and an evaluated product; lateral load usually needs a grade beam or tie between columns

Newman’s article groups piles with drilled piers as reliable and versatile but costly, and mainly used in poor soils. Expansive clay on much of the Front Range is a soil problem of exactly that kind.

Metal building foundation requirements in Denver

Denver’s commercial building code is the 2024 IBC with city amendments. Section 1809.5 requires foundations to be protected from frost by extending below the frost line, building to ASCE 32, or bearing on solid rock. The frost line for the City and County of Denver is 36 inches below finished grade.

There is one exception, for free-standing buildings that meet all of these conditions:

  • assigned to Risk Category I;
  • 600 square feet or less of light-frame construction, or 400 square feet or less of other construction;
  • eave height of 10 feet or less.

Most metal shops, barns and warehouses are bigger or taller than that, so they need frost-protected foundations. For a small steel garage or shed on a house lot, the Denver Residential Code has a similar exception in R403.1.4.1 for free-standing accessory structures without living space. Ask the building department which limit applies to a steel-framed kit before relying on it. Suburbs and counties along the Front Range adopt their own codes, so check the frost depth wherever the building will sit.

Front Range clay and the slab question

The Colorado Geological Survey says expansive soil can swell 10 percent or more when it gets wet and push on foundations and slabs with 20,000 pounds per square foot or more. A light building can’t hold that down by weight.

That matters twice for metal buildings. A shallow footing in active clay can heave with the soil. And a hairpin design that ties the frames into a slab-on-grade depends on that slab staying in one piece, which is a lot to ask of a floor sitting on swelling clay. Foundations that carry the frame below the active zone avoid both problems. Our page on foundations for expansive soil covers the wider options, and the soils report tells you how deep the active zone goes. The Denver Residential Code (R401.4) requires a soils test where data show expansive soil is likely. See why geotechnical testing matters on commercial projects.

Helical piles under a steel building

The IBC treats helical piles as deep foundation elements. Section 1810.3.3.1.9 sets their allowable load from the least of several ultimate values: the plate bearing plus shaft resistance, the capacity from well-documented correlations with installation torque, load test results where required, and the strength of the shaft, couplings and plates themselves.

Section 1810.4.11 says each pile is installed to the embedment depth and torque the registered design professional specifies, without exceeding the manufacturer’s rated maximum torque. Section 1810.4.12 calls for special inspection of helical piles under Section 1705.9.

For a metal building the tension side matters most. ICC-ES AC358 sets out how helical pile systems are evaluated for axial compression, axial tension and lateral loads. A pile under a frame column can be designed to resist the uplift from the plates bearing on soil below the clay, instead of from a block of concrete sized for ballast. Where the piles also take the frame thrust as lateral load, IBC 1810.3.3.2 requires that capacity to come from an approved analysis or from lateral load tests to at least twice the design load. A grade beam or a tie between opposite columns can take the thrust instead.

The piles need no concrete cure before the steel goes up, and the torque reading on each one goes into the installation record the inspector reviews.

Before you order the building

  1. Get the soils report first, including swell test results and the depth to firmer material.
  2. Ask the supplier for the column reactions under dead, snow, wind and seismic load, and whether columns are pinned or fixed at the base.
  3. Have a structural engineer choose the foundation system before the steel order is final. Pinned bases are usually easier on the foundation.
  4. Decide on floor pits, trenches and future slab cuts now, because they rule out hairpins and tie rods.
  5. Confirm the frost depth and permit requirements with the building department.
  6. Get anchor bolt layouts and templates from the steel supplier before any foundation work starts.

Planning a metal building on the Front Range?

Site Safe Helical Piers installs residential and commercial helical piles for new construction in Denver and along the Colorado Front Range, and can help line up foundation design and geotech reports. See our services, contact us or call 970-673-5615 for a free estimate.

FAQ

Do metal buildings need a special foundation?

Usually, yes. Single-story metal buildings weigh about 2 to 5 psf, so wind creates net uplift, and their rigid frames push sideways on the column bases. The foundation has to resist both, not just carry weight.

Can you put a metal building on a concrete slab?

Many sit on a slab, but the slab alone usually isn’t the foundation. Column footings, a thickened edge, a mat or piles carry the frame loads, and hairpins only work if the slab is designed as a structural element and never cut.

How deep does a metal building foundation need to be in Denver?

Below the 36-inch frost line, unless the building is free-standing, in Risk Category I, no more than 600 square feet (light-frame) or 400 square feet (other construction), and 10 feet or less at the eave.

Can helical piles be used for a steel building foundation?

Yes. Helical piles evaluated under AC358 can be designed for compression, tension and lateral load, and the IBC sets how their capacity is determined and inspected. An engineer specifies the depth and torque for each pile.

Does the metal building kit include the foundation?

No. The supplier provides the steel and the column reactions. The foundation design, usually sealed by an engineer for the permit, and the foundation work are separate.

Sources

  1. STRUCTURE magazine, Foundations for Metal Building Systems: Finding a Practical Solution for Your Project (Alexander Newman, July 2013)
  2. Denver Commercial Building Code 2025 (2024 IBC with Denver amendments), Chapter 18 Soils and Foundations: 1809.5, 1810.3.1.5, 1810.3.3.1.9, 1810.3.3.2, 1810.4.11, 1810.4.12
  3. Denver Residential Code 2025 (2024 IRC with Denver amendments), Chapter 4 Foundations: R401.4 and R403.1.4.1
  4. Colorado Geological Survey, Expansive Soil and Rock
  5. ICC-ES AC358 Acceptance Criteria for Helical Pile Systems and Devices (published April 2025), Section 1.2

Topics: metal buildings, steel buildings, commercial foundations, helical piles, frost depth, expansive soil

Get your free estimate

You’ll see why we’ve earned the reputation as being one of the top new construction foundation companies in Colorado & why we offer a rock solid guarantee to back it up.

Call now

970-673-5615

Free estimate