Geotechnical Report: What's in It and How to Read One Before You Build in Colorado

An opened split-spoon sampler on a field table holding a recovered core of sandy soil from a geotechnical boring
An opened split-barrel (split-spoon) sampler with the soil it brought up from a boring. Samples like this feed the boring log and the lab tests in the report. Photo: Trainsandotherthings, via Wikimedia Commons · Source · CC BY-SA 4.0 · Resized

A geotechnical report is the written result of a soils investigation: where the borings went, what came out of them, what the lab found, and what the engineer recommends the foundation do about it. On a new build it comes before the structural design, and on the Front Range it usually decides whether the house sits on footings, piers or piles.

The summary page is the part most people read. The boring logs and the recommendations section are where the structural engineer and every foundation bidder will look, so it pays to know what they say.

What is a geotechnical report?

People call it a geotech report, a soils report or a soil report. On a building project they mean the same document. IBC Section 1803.1 says geotechnical investigations that involve in-situ testing, lab testing or engineering calculations are done by a registered design professional, and 1803.4 requires that professional to have a qualified representative on site during boring and sampling.

On the residential side, IRC R401.4 requires a soils test where expansive, compressible or shifting soils are likely. Without a geotechnical evaluation, Table R401.4.1(1) assumes clay and silt carry only 1,500 psf, which is the code’s cautious default and often not what a designer wants to use.

The Colorado Geological Survey is blunt about who should do the work on swelling soil. It says only a competent professional soil engineer and engineering geologist should be relied on to identify the hazard.

What the building code says a report must include

IBC 1803.6 lists what the written report submitted to the building official has to contain. Use it as a checklist when yours arrives:

  1. A plot showing where each boring or test pit was.
  2. Complete boring logs and penetration test logs, and the soil samples.
  3. A record of the soil profile.
  4. The water table elevation, if groundwater was found.
  5. Recommendations for foundation type and design, including bearing capacity, provisions for expansive soil, mitigation of liquefaction and settlement, and the effects of adjacent loads.
  6. Expected total and differential settlement.
  7. Deep foundation information under 1803.5.5.
  8. Special design and construction provisions for expansive soils, as needed.
  9. Compacted fill properties and testing.
  10. Controlled low-strength material properties and testing, where used.

If one of those is missing and it applies to your lot, ask the engineer before the plans go in.

How to read a boring log

The boring log is the page that shows, depth by depth, what the drill hit. Each log covers one boring. Expect columns roughly like these:

ColumnWhat it tells youWhat to look for
DepthFeet below the ground surface at the boringWhere each layer starts and stops
Soil descriptionMaterial, color, moisture, often a USCS symbol (CL, CH, SM, GP)Clay (CL, CH) near the surface, claystone or sandstone bedrock lower down
Sample typeSplit-spoon, drive sample or otherWhere the lab samples came from
Blow count (N)Standard penetration test resistanceLow counts in soft soil, rising counts as the ground gets firmer
Moisture and dry densityLab results on the sampleDry, dense clay can swell hard when it gets wet
Swell or consolidationPercent swell or settlement under a set loadThe number that drives Front Range foundation choices
GroundwaterDepth water was seen, during or after drillingWater near footing or pile depth

ASTM D1586 describes the standard penetration test: a 140 lb hammer dropped 30 inches drives a 2 inch split-barrel sampler, and the N-value is the number of blows to drive it from 0.5 to 1.5 feet of an 18 inch drive. Higher N means denser or stiffer ground. When the log shows very high counts or refusal, the drill has hit something hard, which matters to anyone planning to install piles.

The sampler in the photo is that split barrel. Once it’s opened, the field engineer logs the soil and bags samples for the lab.

Swell tests: the number Colorado builders care about

On expansive soil, the most important lab results are the swell tests. ASTM D4546 covers one-dimensional swell or collapse of soils: a sample is loaded, wetted, and its change in height is measured. The test can also find the swell pressure, defined as the minimum vertical stress needed to stop the sample from swelling.

The Colorado Geological Survey calls these design tests (it names the consolidation-swell test for buildings) and separates them from index tests that screen for problem soil. CGS also gives the scale of the problem. Swelling clay can expand 10 percent or more as it gets wet and push with pressures of 20,000 psf or more, and a volume increase of 3 percent or more is considered potentially damaging and calls for specially designed foundations.

The code’s screening rule is in IBC 1803.5.3. Soil is classed as expansive when it meets four criteria: a plasticity index of 15 or more, more than 10 percent passing a No. 200 sieve, more than 10 percent finer than 5 micrometers, and an expansion index above 20. If the expansion index test is run, the first three don’t have to be.

When you read your report, find the swell percentages and the swell pressure, note the depth of each sample, and see how deep the engineer thinks moisture changes will reach. That depth, often called the active zone, is what deep foundations have to get below.

Groundwater and deep foundation recommendations

Two sections of the report matter most to a pile or pier contractor.

Groundwater is the first. IBC 1803.5.4 requires the investigation to determine whether groundwater is above or within 5 feet below the lowest floor level where that floor is below finished ground. Water near a basement floor changes drainage and waterproofing. Water at pile depth changes how drilled piers are built and can matter for steel corrosion.

The deep foundation section is the second. Under IBC 1803.5.5, unless enough data already exists, the investigation covers:

  • recommended deep foundation types and installed capacities
  • center-to-center spacing
  • driving criteria and installation procedures
  • field inspection and reporting, including verification of bearing capacity
  • load test requirements
  • suitability of materials for the environment
  • the bearing stratum, and group-action reductions where needed

That list is what a helical pile installer reads before quoting. The bearing layer and its depth set pile length, the capacities set the helix configuration, and the inspection items set what goes in the installation log. If your report recommends drilled piers only, ask the engineer whether helical piles are acceptable, since the design inputs are mostly the same.

Expansive soil design recommendations

IBC 1808.6 gives the engineer several ways to deal with expansive soil: design the foundations to resist the volume change (1808.6.1), design the slab on ground for it (1808.6.2), remove the expansive soil to a depth that keeps moisture constant (1808.6.3), or stabilize it with approval (1808.6.4). Your report will usually recommend one or a mix of these. On high-swell lots the common answer is piers or piles below the active zone, a grade beam, and a structural floor, with notes on drainage and keeping water away from the foundation.

Colorado also ties the soils report to the sale of new homes. The Colorado Geological Survey says its SP-43 swelling soils guide satisfies part of the state’s disclosure requirements for new houses built on swelling soil. If you’re buying a new home rather than building one, ask the builder for the soils information that goes with it.

For more background, see our posts on soil testing before building a new home, geotechnical testing for commercial construction and why helical piers suit Colorado soil.

What to do once you have the report

  1. Check it against the IBC 1803.6 list above.
  2. Send the full report, logs and all, to the structural engineer. The summary page isn’t enough.
  3. Send the same full report to foundation bidders so everyone prices the same ground.
  4. Ask the engineer to confirm the bearing layer, the active-zone depth and the design swell pressure in writing on the plans.
  5. If the logs show cobbles, refusal or shallow water, ask how that changes the foundation type and the schedule.
  6. Keep it with the house records. Future additions and decks will need it.

Have a soils report and need piles?

Site Safe Helical Piers installs helical piles for new homes, additions, decks and commercial projects around Denver and the Colorado Front Range. Send us your geotechnical report and plans through our services page or contact us, and we’ll price the piles against the ground your engineer found. You can also call 970-673-5615 for a free estimate.

FAQ

What is a geotechnical report?

It’s the written result of a soils investigation by a registered design professional. It records where the borings went and what they found, gives lab results, and recommends foundation type, bearing capacity and any special provisions for expansive soil or groundwater.

What does a geotechnical soil report include?

Under IBC 1803.6: a boring location plot, complete boring and penetration test logs, the soil profile, the water table if found, foundation recommendations, expected settlement, deep foundation information, expansive-soil provisions, and fill properties and testing.

Is a geotechnical report the same as a soil report?

On a building project, yes. “Soils report”, “soil report” and “geotech report” all refer to the geotechnical investigation report. An agricultural soil test that measures nutrients is a different thing.

Do I need a geotechnical report to build a house in Colorado?

The residential code requires a soils test where expansive, compressible or shifting soils are likely (IRC R401.4), and swelling soil underlies many populated parts of Colorado. Check with your local building department, but plan on one for most Front Range lots.

Who prepares a geotechnical report?

A registered design professional, usually a geotechnical engineering firm, with a qualified representative on site during drilling and sampling (IBC 1803.1 and 1803.4).

Sources

  1. Denver Commercial Building Code 2025 (2024 IBC with Denver amendments), Chapter 18 Soils and Foundations: 1803.1-1803.6, 1808.6
  2. Denver Residential Code 2025 (2024 IRC with Denver amendments), Chapter 4 Foundations: R401.4, R401.4.1, Table R401.4.1(1), R403.1.8
  3. ASTM D1586/D1586M-18, Standard Test Method for Standard Penetration Test (SPT) and Split-Barrel Sampling of Soils
  4. ASTM D4546-21, Standard Test Methods for One-Dimensional Swell or Collapse of Soils
  5. Colorado Geological Survey, Expansive Soil and Rock
  6. Colorado Geological Survey, SP-43 A Guide to Swelling Soils for Colorado Homebuyers and Homeowners (2nd ed., 2007)

Topics: geotechnical report, soils report, boring logs, expansive soil, deep foundations, new construction